IWS were commissioned by Morrison Plc. to undertake large diameter mains installation at works South Staffordshire Water Plc.’s Seedy Mill Water Treatment Plant. The project was delivered over an eighteen month period and also incorporated trunk main alterations works with a value of over £1 million.

Project activities included the installation of new 1000mm ductile iron water mains. The works were part of a major refurbishment programme to the water treatment works and included all associated connections to the distribution network and modifications to the treatment plant.

The flexibility of IWS and their dedicated and highly skilled engineers and teams ensured that the project was successful with no adverse events arising for either South Staffordshire Water or Morrison PLC.